Port Delay may bring benefits in reduced construction costs

With BC about to enter into a recession, the delayed construction of phase two of the Fairview Container Port may at least benefit from a re-evaluation of labour and construction costs for such huge projects.

That is one of the small silver linings that a UBC professor has outlined for the Daily News on the details of Friday’s Globe and Mail story on an eighteen month delay of the much anticipated expansion project…

(from  the blog a town called podunk, click on the link below to see the entire article atowncalledpodunk.blogspot.com/2 … 4392109587 )-